R3F/RO21 Rowatt 230kV Area Development Project - Line Construction
- Buyer
- Saskatchewan Power Corporation (SaskPower)
- Location
- Regina-Moose Mountain, SK, CAN
- Closing date
- Aug 10, 2026
- Published
- Jul 2, 2026
- Province or region
- Saskatchewan
- Notice type
- Open to bid
- Reference number
- 0000326322
- Solicitation number
- 1018583
Summary
SaskPower seeks contractors to construct a new overhead 230 kV double-circuit transmission line from near R2F STR#175 to Rowatt Switching Station (Regina area). Scope: install 43 T72, eight T90, two T73 galvanized steel structures; string twin-bundled Drake ACSR conductors and 2x 1/2" overhead shield wires; terminations and six concrete foundations (alternate). Mobilize Sept 2026; complete by Mar 15, 2027.
From the notice
This project is required to facilitate the re-termination of the R2F 230kV line from Regina South Switching station to the Rowatt switching station (to be the new R3F line Fleet to Rowatt). Re-termination of the R2F line from Fleet Switching station to the Rowatt Switching station (to be the new RO21 line Regina South to Rowatt). This job specification provides instruction to construct the new overhead 230kV double circuit transmission line starting near the existing R2F STR#175 to the Rowatt Switching Station. The scope of work includes: Installation of forty-three (43) T72 series galvanized steel structures Installation of eight (8) T90 series self-supporting galvanized steel structures. Installation of two (2) T73 series galvanized steel structures. Stringing of double-circuit twin-bundled Drake ACSR conductors Stringing of 2x – 1/2” steel overhead shield wires Termination of the conductor at the A-Frame as per 230-INS-DES-015 & T07/086. Termination of the OHSWs at the A-Frame as per T07/000-OHG-DES-006. Installation of six (6) additional concrete foundations as part of an alternate project (N153 - R3C & P4R) located directly south of the Rowatt station. This is foundation installation only, no structure work is required. Commence mobilization activities Upon Contract award and kick off meeting*: Tentatively scheduled for week of September 14, 2026* *Note: A final schedule shall be determined by SaskPower with a proponent as a part of negotiations and prior to execution of any Contract. Successful achievement of Construction Completion in accordance with the requirements of the Contract: No later than March 15, 2027