GENERATION WHOLESALE SECURITY INFRASTRUCTURE UPGRADE, POINTE DU BOIS GENERATING
- Buyer
- Manitoba Hydro
- Location
- Southeast, MB, CAN
- Closing date
- Aug 17, 2026
- Published
- Jul 10, 2026
- Province or region
- Manitoba
- Notice type
- Open to bid
- Reference number
- 0000327103
- Solicitation number
- 043539
Summary
Manitoba Hydro seeks a contractor for Phase 1 of a security infrastructure upgrade at Pointe du Bois Generating Station (Manitoba). Scope includes mobilization and onsite material delivery, general construction per drawings/specs, system integration, testing and commissioning, demobilization, and as-built drawings, manuals and close-out documentation.
From the notice
SCOPE O THE WORK The Work consists of all that is required to complete Phase 1 of the Security Infrastructure Upgrade at the Pointe Du Bois Generating Station, including supplying labour, materials, equipment, and plant, except as herein provided, and perform all Work identified. Descriptions of ITEMS of the Work listed below are provided as a general overview. Detailed Purchaser’s Requirements are provided in the Technical Requirements, 01_11_00_Summary of Work_Phase 1, and on the Purchaser’s Drawings. The Work includes the following ITEMs: ITEM 1: Mobilization at Pointe du Bois Generating Station. All procurement complete with delivery of material onsite. ITEM 2: General Construction as detailed in the drawings and technical specifications. ITEM 3: System integration, testing, commissioning, and demobilization. ITEM 4: Provide an as-built drawing package, manuals, and close out documentation.
Work type
Contact
Adriana De Luca