Consulting Services for Cornish Lift Station Upgrades & St Charles Lift Station
- Buyer
- The City of Winnipeg
- Location
- Winnipeg, MB, CAN
- Closing date
- Aug 14, 2026
- Published
- Jul 20, 2026
- Province or region
- Manitoba
- Notice type
- Open to bid
- Reference number
- 0000327902
- Solicitation number
- 530-2026
Summary
The City of Winnipeg seeks consulting engineering and contract administration for Cornish Lift Station upgrades and St. Charles Lift Station demolition in Winnipeg, Manitoba. Work includes preliminary and detailed design, construction/demolition documents, procurement support, PLC programming, resident and non-resident contract administration, commissioning, record drawings and project closeout.
From the notice
Professional Consulting Services for Cornish Lift Station Upgrades and St Charles Lift Station Demolition D4. SCOPE OF SERVICES D4.1 The Services required under this Contract shall consist of providing engineering and contract administration services for both Cornish Lift Station and St. Charles Lift Station in accordance with the following: (a) Preliminary Engineering Design (D7); (b) Detailed Engineering Design (D7.8(a)(i)); (c) Construction and Demolition Documents (D9); (d) Procurement Process (D10); (e) Cornish Lift Station PLC Programming (D11); (f) Contract Administration Services – Non-Resident (D12); (g) Contract Administration Services – Resident (D13); (h) Cornish Lift Station Commissioning (D14); (i) Record Documents and Project Closeout (D15); and (j) Additional Work Allowance (D16). D4.1.1 The Services required under D4.1 shall be in accordance with the City’s Project Management Manual https://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#3 and templates http://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#4 . Notwithstanding the foregoing, the Consultant is being engaged by the City for their professional expertise; the Consultant shall bring to the Consulting Contract Administrator’s attention any aspect of the City’s Project Management Manual or templates which the Consultant is of the opinion is not consistent with good industry practice. D4.1.2 Where the Services required include Contract Administration, Consultants shall pay particular attention to the revisions to Section 9.19 and 9.20.1 of the City’s Project Management Manual in Addendum #8. https://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#3 D4.2 The following shall apply to the Services: (a) The City of Winnipeg, Water and Waste Department - Electrical Design Guide, current revision: https://winnipeg.ca/waterandwaste/dept/manual.stm#wastewater (b) The City of Winnipeg, Water and Waste Department - Automation Design Guide, current revision: 03 attached as Appendix F (c) The City of Winnipeg, Water and Waste Department – Identification Standard, current revision: https://winnipeg.ca/waterandwaste/dept/manual.stm#wastewater (d) The City of Winnipeg, Water and Waste Department – HMI Layout and Animation Plan, current revision: 02 attached as Appendix G (e) The City of Winnipeg, Water and Waste Department – Tag Naming Standard, current revision: 00 attached as Appendix H (f) City of Winnipeg Green Building Policy: New City-Owned Buildings and major additions http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=5989 (g) Universal Design Policy http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604